2021 : |
- 25” API Pipe mill line up-gradation (Clamp,
Lifter car and etc) / India |
|
- 24” Stainless steel mill line. |
|
- ERW API Pipe Mill & Finishing Line / India
|
|
|
|
2020 : |
- 2.5” Stainless steel ERW Mill Finishing line
/ Thailand |
|
- 12” Upgrade of Hydrostatic tester / Korea |
|
|
- 25” Rolls and Driving part Upgrade / India |
|
|
|
|
2019 : |
- 400 x 400, square reshaping section / India |
|
|
- 8” API Finishing line length extend for handling
equipment / Korea |
|
|
- Consulting the modification of 25” & 95/8”
API mill / India |
|
|
- Consulting the upgrade of 16” API mill line
/ india |
|
|
|
|
2018 : |
- 12” Color Band Marking / Korea |
|
|
- 4” Threading Machine Line / Korea |
|
|
- 9 5/8” Finishing equipment & Filtration,
Aspiration system / Russia |
|
|
- 2.5” Stainless steel ERW Mill & Finishing
line / Vietnam |
|
|
|
|
2017 : |
- 12” Hydrostatic tester for two(2) head, Max
650 bar / Korea |
|
|
- 7” Finishing equipment & Filtration, Aspiration
system / Russia |
|
|
- 5” Entry & Turks head / Malaysia |
|
|
|
|
2016 : |
- 17” Hydrostatic Tester for coupling leak &
Auto Drift Tester / Russia |
|
Max pressure 750 Bar)
On line |
|
|
|
|
2015 : |
- 3.5” ERW API Tubing Mill Line & Finishing
Line / Korea (Turn-key base project) |
|
- 24” Hydrostatic Tester up-grade / Korea (350bar
-> 500bar, Increase cycle time) |
|
Head Stock, Tail Stock,
Tool, Seal, Intensifier, Hyd-unit & etc. |
|
|
|
|
2013 : |
- 7inch Structural ERW Mill Line / Saudi-Arabia |
|
|
- 24” Cage Forming section modification / Korea |
|
|
|
|
2012 : |
- 5.5” Entry & Finishing Line / Japan |
|
|
Auto Bead Remover,
End Facing M/C, Bundling M/C & etc |
|
|
|
|
2011 : |
- 12” ERW API Finishing Line / U.S.A |
|
|
End Facing M/C, Hydrostatic
Tester, Auto Bundling M/C & etc. |
|
|
- 21” Hydrostatic Tester(Max Pressure 500bar &
Auto Drift tester / Russia |
|
|
|
2010 : |
- 20” Hydrostatic Tester for coupling leak / Korea.
(off line sample test) |
|
|
|